Checklist

NR/L2/OHS/003 roster checklist

The Network Rail fatigue management standard sets two kinds of number. Hard limits are not to be rostered. Triggers require a documented exceedance assessment and a management plan, after which the work may still proceed. Treating a trigger as a breach puts a planner in the wrong conversation with the regulator; treating a limit as a trigger puts them in a worse one. Tick each line against the roster before it is published.

Every figure below is read from the Network Rail NR 003 profile in the RotaPulse engine (v2026.08.0), the same profile that scores a rail shift on the free FRI calculator. Guidance, not a safety certification.

Hard limits: not to be rostered

Triggers: exceedance assessment required

Crossing one of these does not stop the work. It requires the exceedance to be declared, assessed and managed in writing.

Advisory: good practice under the standard

RotaPulse's early warning, not the standard's

There is no pass mark. A fatigue index is a comparison with a reference pattern, not a verdict on a person, and every published evaluation of the FRI makes the same point: planned rotas understate real fatigue. Score the roster as planned, then score the hours as worked.

Score one duty against this profile on the free FRI calculator, or read how the standard sits alongside ORR's fatigue factors and the RAIB London Bridge findings on the rail page. RotaPulse scores whole rosters against it, free up to 10 workers.

Sources: Network Rail NR/L2/OHS/003; supply-chain procedures implementing it (VolkerRail SAF06 Issue 7; Rail Safe Group BMS 10/2/1, Aug 2024); HSE Research Report RR446. RotaPulse is a TeZe Ltd product. rotapulse.co.uk/fri-calculator/nr-l2-ohs-003-checklist